** INSTALLED BASEMENT AT 12 DEGRESS, TRY THAT WITH A POURED FOUNDATION. ** WITH BLANKETS IN PLACE AND TEMPERATURE ON THE UPSWING, BASEMENT FLOOR POURED 3 DAYS LATER.